What is a Pay Back Period (PBP)?
Pay Back Period (PBP) is the length of time that must elapse before the cost of a project is fully recovered and is arrived at by comparing its payback period called PI with pre-determined payback period called P0.
Let us connect on social media forever;
Somtochukwu
Visionary Leader and Development Economist in Nigeria. CEO at Bufiredd Economic Consults Ltd