Blackout Imminent As Kainji Dam Bursts, Nigeria To Lose 760MW

Kainji Hydroelectric Dam has experienced a sudden burst which could lead to blackouts in some Nigerian states, Daily Times gathered.

The embankments of the Kainji dam, one of Nigeria’s hydro-power stations caved in after the opening of the four spillway gates to free surplus water caused by heavy rains.

On Sunday, the management, Mainstream Energy Solution Limited, opened the points but discovered that the dam was impounding more water than it should.

“We opened the 4 spillway gates because of the water pressure. Now, it is hitting the embarkment and will continue to expand if not reinforced. The embarkment is falling, rocks are falling into the water”, an official disclosed the information

The dam, which produces hydroelectric power, is located in the New Bussa town of Borgu Local Government Area of Niger State.

Authorities and the firm have shut down the hydro-power station for repairs and will take about 760MW of electricity off the national grid.

Abdulrasaq Jakada, a top official of the Emir of Borgu’s palace said the monarch has been informed of the development.

 Click here to save this Post as PDF
Let us connect on social media forever;
Keep in touc

Somtochukwublogng

Serving news and stories to the people of the Federal Republic of Nigeria.

Contents created by Taiwo Hammed.
Avatar
Keep in touc

Leave a Reply

Your email address will not be published. Required fields are marked *